|
Program Evaluation Reports (PERs) and Program Evaluation Plans (PEPs)
NIOSH is committed to applying the best available science in dose reconstructions. In keeping with this commitment, completed cases with probabilities of causation less than 50% are reviewed as relevant new information becomes available. The results of these reviews are described in a Program Evaluation Report (PER). The PER details the effect, if any, of the new information on the completed dose reconstruction. If it appears that the new information may result in an increase in dose for a completed dose reconstruction with a probability of causation of less than 50%, NIOSH is committed to working with the Department of Labor to reopen and rework the dose reconstruction, as appropriate. A Program Evaluation Plan (PEP) describes plans for evaluating specific program details or issues.
At the current time, no PERs or PEPs specific to Revere Copper and Brass have been developed. However, we have developed PERs and PEPs that pertain to multiple sites. To view all PERs and PEPs that have been developed, please refer to the Program Evaluation Reports (PERs) and Program Evaluation Plans (PEPs) page.
Top of Page
Worker Outreach Activities
Based on a recommendation from the Advisory Board to provide workers and site experts with opportunities to participate in developing the technical documents used in dose reconstruction, NIOSH established a Worker Outreach Program.
At Worker Outreach Meetings, current and former DOE and AWE employees have opportunities to obtain information about Site Profiles, Technical Basis Documents, and Technical Information Bulletins, and to provide information for consideration and possible use in dose reconstruction. This process is valuable to ensure that the technical documents used in dose reconstruction contain correct and useful information.
Below are the Worker Outreach Activities for Revere Copper and Brass:
At the current time, worker outreach activities have not been scheduled.
Top of Page
Comments on Revere Copper and Brass Documents
How to Submit Comments
Comments on Revere Copper and Brass documents can be submitted to the NIOSH Docket Officer electronically by e-mail at NIOCINDOCKET@cdc.gov or
printed comments can be mailed to NIOSH Docket Office, Robert A. Taft Laboratories, MS-C34, 4676 Columbia Parkway, Cincinnati, OH 45226. Please include
the Site Profile/Docket Number (205) on all comments.
Comments Received
At this time, no comments have been submitted on Revere Copper and Brass documents.
Top of Page
Special Exposure Cohort Petition Information for Revere Copper and Brass
- Classes Added to the SEC
- Revere Copper and Brass--All Atomic Weapons Employer employees who worked at Revere Copper and Brass, Detroit, Michigan, from July 24, 1943 through December 31, 1954, for a number of work days aggregating at least 250 work days, occurring either solely under this employment or in combination with work days within the parameters established for one or more other classes of employees included in the Special Exposure Cohort
- Petitions Qualified for Evaluation
Location: Detroit, Michigan
Job Titles and/or Job Duties: Extruders and Shapes Specialists who worked in the Rod and Shape Mill
Period of Employment: January 1, 1943 through December 31, 1984
- Federal Register Notice Announcing that a
Revere Copper and Brass SEC Petition has met the Minimum Qualifications
for Review and Evaluation
March 25, 2010
PDF 43 KB (1 page)
- Copy of the Petition Received
Copy of the Revere Copper and Brass SEC petition received
(January 26, 2010)
PDF 630 KB (11 pages)
- SEC Petition Evaluation Report
SEC Petition Evaluation Report for Revere Copper and Brass
(Approved July 20, 2010)
PDF 386 KB (64 pages)
- Petition Discussed by the Advisory Board
The petition was discussed by the Advisory Board on August 11, 2010, during its regular meeting.
- Advisory Board Recommendation on SEC Petition
Advisory Board recommendation on the Revere Copper and Brass SEC petition
(September 1, 2010)
PDF 48 KB (2 pages)
- HHS Letter to Congress Regarding the SEC Petition
HHS Letter to Congress Regarding the Revere Copper and Brass SEC Petition
(October 6, 2010)
PDF 112 KB (11 pages)
- Federal Register Notice: Designation of a Class of Employees
for Addition to the Special Exposure Cohort
Designation of
a Class of Employees from Revere Copper and Brass to the SEC (July 24, 1943 through December 31, 1954)
(October 21, 2010)
PDF 48 KB (1 page)
- HHS Designation of Additional Members to the SEC
HHS Designation of a Class of Employees from Revere Copper and Brass (July 24, 1943 through December 31, 1954)
(October 6, 2010)
PDF 41 KB (6 pages)
- Effective Date for the SEC Class
November 5, 2010 (July 24, 1943 through December 31, 1954)
- Federal Register Notice: Final Effect of Designation of a Class
of Employees for Addition to the Special Exposure Cohort
Final Effect of Designation of a Class of Employees from Revere Copper and Brass for Addition to the SEC (July 24, 1943 through December 31, 1954)
(December 1, 2010)
PDF 52 KB (1 page)
- Letter to DOL Regarding the Addition of a New Class of Employees to the SEC
Letter to DOL regarding the addition of a new class of employees to the SEC from Revere Copper and Brass (July 24, 1943 through December 31, 1954)
(November 8, 2010)
PDF 29 KB (1 page)
Top of Page
|