Hoisting system components--selection and guidelines: volume 4.
Source
Pittsburgh, PA: U.S. Department of the Interior, Bureau of Mines, Contract-J0308007, 1988 May; :1-401
Abstract
This report provides a comprehensive compilation of information for the development and design of a mine hoist system. The research was divided into two phases. Phase I was a search of world literature pertinent to the analysis of hoisting systems. Phase II consisted of summarizing operating information and recommendations from manufacturers, hoist operators, and consultants on methods for selection and design of hoist systems and components.
Keywords
Electric-drives; Mining-equipment; Specifications; Design-criteria; Mining-engineering; Rollers; Control-equipment; Controllers; Control-circuits; Mine-hoisting; Hoists; Structural-design; Sheaves-Drives
Document Type
CP; Final Contract Report
NTIS Accession No.
PB92-235787
Identifying No.
OFR 83D-92; Contract-J0308007
Source Name
Pittsburgh, PA: U.S. Department of the Interior, Bureau of Mines, Contract-J0308007
Performing Organization
Rexnord Inc.