Development of a Continuous Shaft Lining System. Volume III.

Authors
Torbin-RN; Brunsing-T; Ounanian-DW; Et Al
Source
NTIS: PB/84-113232 :510 pages
Link
NIOSHTIC No.
10007284
Abstract
The objective of this three-volume report was to develop a system to reduce the costs, safety hazards, and time currently required in lining mine shafts with concrete. The continuous shaft lining system will line machine-bored shafts downward from the shaft collar on a continuous basis using an inverted, pressurized slipforming technique. Volume III, the appendix, contains related information on the laboratory tests and test facilities.
Publication Date
19830101
Document Type
CP; Final Contract Report;
Fiscal Year
1983
NTIS Accession No.
PB84-113232
NTIS Price
A23
Identifying No.
OFR 186(3)-83
Source Name
NTIS: PB/84-113232
Performing Organization
Foster-Miller, Inc.