NIOSHTIC-2 Publications Search

Alumina Process Feasibility Study and Preliminary Pilot Plant Design. Task 3 Report: Preliminary Design of 25 Ton Per Day Pilot Plant. Volume IV Appendix B. General Specifications.

Authors
Bengston-KB; Chuberka-P; Nunn-RF; Et Al
Source
For Reference Only At Bureau Libraries :201 pages
Link
NIOSHTIC No.
10006849
Abstract
This appendix contains the general specifications for a 25-ton-per- day pilot plant as described in Volume I of this six-volume report.
Publication Date
19790101
Document Type
CP; Final Contract Report;
Fiscal Year
1979
Identifying No.
OFR 122(4)-80
NIOSH Division
RERC;
Source Name
For Reference Only At Bureau Libraries
Performing Organization
Kaiser Engineers, Inc.
Page last reviewed: April 12, 2019
Content source: National Institute for Occupational Safety and Health Education and Information Division