NIOSHTIC-2 Publications Search

Development of a continuous shaft lining system. Volumes I through III.

Authors
Torbin R; Brunsing T; Ounanian D; Henderson R; Kelly J
Source
Pittsburgh, PA: U.S. Department of the Interior, Bureau of Mines, OFR186(1-3)83, 1983 Jan; :1-854
Link
NIOSHTIC No.
10003164
Abstract
The objective of this three-volume report was to develop a system to reduce the costs, safety hazards, and time currently required in lining mine shafts with concrete. Volume I describes a basic continuous shaft lining system, the design and operation of a prototype unit, and estimates of cost. Volume II summarizes the results of the laboratory- and full-scale tests conducted during the program. Volume III contains related information on the laboratory tests and test facilities.
Keywords
Concrete construction; Continuous casting; Cost estimates; Lining processes; Mine shafts; Mining equipment; Shaft sinking; Slip forms; Underground mining
Publication Date
19830101
Document Type
CP; Final Contract Report
Fiscal Year
1983
NTIS Accession No.
PB84-113208
NTIS Price
A99
Identifying No.
OFR186(1-3)83; Contract-J0333915
NIOSH Division
PRC
Source Name
Pittsburgh, PA: U.S. Department of the Interior, Bureau of Mines, OFR186(1-3)83
State
MA; DC; PA
Performing Organization
Foster-Miller, Inc., Waltham, MA
Page last reviewed: May 3, 2019
Content source: National Institute for Occupational Safety and Health Education and Information Division