Skip directly to search Skip directly to A to Z list Skip directly to page options Skip directly to site content

NIOSHTIC-2 Publications Search

Search Results

Analysis of men, material and supplies handling systems in underground metal and nonmetal mines - 3 volume set. Volume 3 - appendices associated with phase I report.

Authors
Anonymous
Source
Spokane, WA: U.S. Department of the Interior, Bureau of Mines, Contract S0241085, 1975 Sep; :1-242
Link
NIOSHTIC No.
10001150
Abstract
This work documents the productivity and safety aspects of the existing equipment and systems utilized in transporting personnel and supplies from the surface to the underground production work place. The present systems study documents the productivity and safety of existing men and material movement systems for six representative underground metal and nonmetal mines. Identification of common problem areas was defined using recognized industrial engineering techniques. The backup data for the industrial engineering analysis of each mine are included as respective appendices.
Keywords
Underground mining; Logistics management; Personnel management; Materials handling; Supply management; Stope mines; Mine haulage; Safety engineering; Metalliferous minerals; Nonmetalliferous minerals; Statistical data; Explosives; Hoists; Mining engineering; Personnel movement; Cut and fill mining; Vertical transport operations; Surface to underground
Publication Date
19750925
Document Type
CP; Final Contract Report
Fiscal Year
1975
NTIS Accession No.
PB-249133
NTIS Price
A12
Identifying No.
OFR 8(3)-76; Contract-S0241085
NIOSH Division
SRC
Source Name
Spokane, WA: U.S. Department of the Interior, Bureau of Mines, Contract S0241085
State
WA; CA
Performing Organization
Theodore Barry and Associates, Los Angeles, California
TOP