Skip directly to search Skip directly to A to Z list Skip directly to page options Skip directly to site content

NIOSHTIC-2 Publications Search

Search Results

Design and development of up-link environmental monitor.

Authors
Bergeron-AA; Mahany-RJ; Mayhew-TG
Source
Pittsburgh, PA: U.S. Department of the Interior, Bureau of Mines, Contract H0357146, 1976 Sep; :1-33
NIOSHTIC No.
20032458
Abstract
This report describes an operational communications system which provides remote intra-terrestrial wireless transmission of environmental information. Design and modification specifications of requisite equipment are included along with a detailed description of system operation.
Keywords
Mining-industry; Mining-equipment; Electromagnetic-fields; Electromagnetic-energy; Electromagnetic-interference; Electromagnetic-radiation; Electromagnetic-wave-transmission; Coal-mining; Radio-waves
Publication Date
19760901
Document Type
Final Contract Report
Funding Type
Contract
Fiscal Year
1976
NTIS Accession No.
NTIS Price
Identifying No.
Contract-H0357146
Source Name
Pittsburgh, PA: U.S. Department of the Interior, Bureau of Mines, Contract H0357146
State
IA; PA
Performing Organization
Rockwell International
TOP