Skip directly to search Skip directly to A to Z list Skip directly to page options Skip directly to site content

NIOSHTIC-2 Publications Search

Search Results

Hoisting system components--selection and guidelines: volume 3.

Authors
Mollick-L
Source
Pittsburgh, PA: U.S. Department of the Interior, Bureau of Mines, Contract J0308007, 1988 May; :1-444
Link
NIOSHTIC No.
10011497
Abstract
This report provides a comprehensive compilation of information for the development and design of a mine hoist system. The research was divided into two phases. Phase I was a search of world literature pertinent to the analysis of hoisting systems. Phase II consisted of summarizing operating information and recommendations from manufacturers, hoist operators, and consultants on methods for selection and design of hoist systems and components.
Keywords
Mining-equipment; Loads-Forces; Shaft-sinking; Design-analysis; Mining-engineering; Cements; Mines-Excavations; Mine-hoisting; Structural-design; Mine-shafts; Wire-rope
Publication Date
19880531
Document Type
CP; Final Contract Report
Fiscal Year
1988
NTIS Accession No.
PB92-235779
NTIS Price
A20
Identifying No.
OFR 83C-92; Contract-J0308007
NIOSH Division
PRC
Source Name
Pittsburgh, PA: U.S. Department of the Interior, Bureau of Mines, Contract J0308007
State
PA; WI
Performing Organization
Rexnord, Inc., Milwaukee, WI
TOP