Skip directly to search Skip directly to A to Z list Skip directly to page options Skip directly to site content

NIOSHTIC-2 Publications Search

Search Results

An Economic Evaluation of Pipeline Gas from Coal.

Authors
Katell-S
Source
Gas 1972 Aug; 48(8):32-34
Link
NIOSHTIC No.
10010669
Abstract
An economic evaluation was made of a plant designed to produce 250 million standard cubic feet per day of high-btu gas using Pittsburgh seam coal. A fluidized gasification system followed by shift conversion, purification, and single-stage tube wall methanation was used to produce 927-btu gas. The total capital investment is estimated to be $194,606,200, or 78 cents per daily scf of gas production capacity.
Publication Date
19720801
Document Type
OP;
Fiscal Year
1972
NTIS Accession No.
NTIS Price
Identifying No.
OP 103-73
Issue of Publication
8
NIOSH Division
MERC;
Source Name
Gas, V. 48, No. 8, August 1972, PP. 32-34
TOP