Skip directly to search Skip directly to A to Z list Skip directly to page options Skip directly to site content

NIOSHTIC-2 Publications Search

Search Results

Basic Estimated Capital Investment and Operating Costs for Underground Bituminous Coal Mines. Mines With Annual Production of 1.03 to 3.09 million Tons from a 48-Inch Coalbed. Revision of IC 8641.

Authors
Katell-S; Hemingway-EL; Berkshire-LH
Source
NTIS: PB 248 967 :32 pages
Link
NIOSHTIC No.
10008059
Abstract
This Bureau of Mines study estimates capital investment, operating costs, and selling prices for three underground bituminous mines producing coal with annual production ranging from 1.03 to 3.09 million tons. It is assumed that the mines have a 20-year life. Wages and union welfare payments are considered as of December 6, 1974, under the bituminous wage agreement of 1974, and costs for material and equipment are based on 1975 indexes. Initial capital investment ranges from $26,498,500 for the 1.03-million-ton-per-year (mm tpy) mine to $67, 173,300 for the 3.09-Mm-tpy mine. Total capital investment ranges from $37,437,500 to $92,984,300 for the same mines. Corresponding selling prices for the coal range from $14.83 To $13.26 Per ton, assuming a 15-percent discounted cash flow rate of return after federal income taxes.
Publication Date
19750101
Document Type
IH; Information Circular;
Fiscal Year
1975
NTIS Accession No.
PB-248967
NTIS Price
A04
Identifying No.
IC 8689
Source Name
NTIS: PB 248 967
TOP