Skip directly to search Skip directly to A to Z list Skip directly to page options Skip directly to site content

NIOSHTIC-2 Publications Search

Search Results

Alumina Process Feasibility Study and Preliminary Pilot Plant Design. Task 3 Report: Preliminary Design of 25 Ton Per Day Pilot Plant. Volume III Appendix A. Equipment List, Specs & Quots. Areas 8-25.

Authors
Bengston-KB; Chuberka-P; Nunn-RF; Et Al
Source
For Reference Only At Bureau Libraries :261 pages
Link
NIOSHTIC No.
10006855
Abstract
This appendix contains the list of equipment, their corresponding numbers, and their specifications, with quotations from vendors and manufacturers who can supply the equipment, as described in volume i of this six-volume report. The listings are arranged by process plant areas.
Publication Date
19790101
Document Type
CP; Final Contract Report;
Fiscal Year
1979
NTIS Accession No.
NTIS Price
Identifying No.
OFR 122(3)-80
NIOSH Division
RERC;
Source Name
For Reference Only At Bureau Libraries
Performing Organization
Kaiser Engineers, Inc.
TOP