Skip directly to search Skip directly to A to Z list Skip directly to page options Skip directly to site content

NIOSHTIC-2 Publications Search

Search Results

Selective Placement of Strip Mine Overburden in the United States. I. Contract Report.

Authors
Workman-JL
Source
NTIS: PB 83-115873 :292 pages
Link
NIOSHTIC No.
10006547
Abstract
The selective placement of coal strip mine overburden is examined. Physical and chemical properties of spoil detrimental to revegetation and ground water are detailed. Five mining methods, already used in the industry, that are capable of selectively handling waste are examined. Technical and economic comparisons are made for the systems when applied to realistic mine settings. The same analysis is conducted for five novel methods capable of selectively handling waste. Comparisons are made between novel and existing methods. Suggestions for new and modified equipment are outlined and recommendations for further research are provided.
Publication Date
19810101
Document Type
CP; Final Contract Report;
Fiscal Year
1981
NTIS Accession No.
PB83-115873
NTIS Price
A14
Identifying No.
OFR 166(1)-82
Source Name
NTIS: PB 83-115873
Performing Organization
Marston & Marston, Inc.
TOP