Skip directly to search Skip directly to A to Z list Skip directly to page options Skip directly to site content

NIOSHTIC-2 Publications Search

Search Results

Procedures for Hoist and Shaft Inspection and Maintenance. Volume II. Inspection and Maintenance Procedures.

Authors
Cseff-J; Forbes-WJ; Mills-AW III
Source
NTIS: PB/83-148056 :140 pages
Link
NIOSHTIC No.
10002680
Abstract
This report discusses in general terms scheduled inspection and preventative maintenance of the hoists and ancillary equipment described in volume 1. Preventative scheduled inspection and maintenance procedures assist in the smooth operation of mine hoisting systems by the prevention of unscheduled or catastrophic equipment failure and its attendant downtime. Schedules and overall maintenance planning are required at the management level. Inspection, maintenance, and unusual operations or incidents must be recorded in records and equipment logs. A cross reference between MSHA regulations and various equipment components is included as part of the report. A discussion of the various nondestructive testing methods that may be applied to hoisting equipment is also included.
Publication Date
19810101
Document Type
CP; Final Contract Report;
Fiscal Year
1981
NTIS Accession No.
PB83-148056
NTIS Price
A08
Identifying No.
OFR 196(2)-82
NIOSH Division
SRC;
Source Name
NTIS: PB/83-148056
Performing Organization
V. B. Cook, Inc.
TOP