Skip directly to search Skip directly to A to Z list Skip directly to page options Skip directly to site content

NIOSHTIC-2 Publications Search

Search Results

Feasibility Study of Electric Shock Prevention.

Authors
Sima-GR; Bennett-JL
Source
NTIS: PB 284 012 Available for Reference At Bureau Libraries :188 pages
Link
NIOSHTIC No.
10001213
Abstract
This report is concerned with feasibility studies, design, and fabrication of a group of prototype hand-held and machine-mounted test instruments for measurement of electrical shock hazards of mining machines. An instrument for use in open pit mining machine ground wire verification was proposed, developed, built, and tested. This report presents the design and operational theory of the open pit instrument as well as information on the program to improve the original prototype hand-held and machine-mounted test instruments.
Publication Date
19770101
Document Type
CP; Final Contract Report;
Fiscal Year
1977
NTIS Accession No.
PB-284012
NTIS Price
A10
Identifying No.
OFR 78-78
NIOSH Division
PRC;
Source Name
NTIS: PB 284 012 Available for Reference At Bureau Libraries
Performing Organization
Bendix Corporation
TOP