Report of Visit to Fluor Engineers and Constructors, Inc., WESCO Project Group, Irvine, California.

Authors
Anonymous
Source
Enviro Control, Inc., Rockville, Maryland 1977 Dec:15 pages
Link
NIOSHTIC No.
00197339
Abstract
Fluor Engineers and Constructors, Inc. was the prime contractor for constructing a coal gasification and liquefaction facility for the WESCO group, in New Mexico. This report discussed a meeting which occurred regarding the WESCO project. Most of the operation for the facility was to be controlled from a centralized control room located across the road opposite the gasification unit. It was anticipated that the gasification facility would employ about 600 workers, with about 400 additional workers employed in mining, transportation and preparation of coal. The design of the coal handling operation was described including coal preparation, coal feeding, coal lock, gasifier, ash lockhoppers, crude gas quench system, carbon-monoxide shift conversion, gas cooling, gas purification, methanation, gas liquor separation, phenosolvan, and sulfur control.
Keywords
NIOSH-Contract; Contract-210-76-0171; Coal-workers; Toxic-gases; Coal-products; Dust-inhalation; Airborne-dusts; Coal-dust; Safety-practices;
Publication Date
19771216
Document Type
Final Contract Report;
Funding Type
Contract;
Fiscal Year
1978
NTIS Accession No.
PB91-174029
NTIS Price
A03
Identifying No.
Contract-210-76-0171
Source Name
Enviro Control, Inc., Rockville, Maryland
State
NM; MD;
TOP