Mining Publication: Technology News 460 - Prototype Borehole Miner Selectively Extracts Gold from Permafrost
July 1997

Placer deposits in permafrost often contain up to 15% cobbles and boulders. Because of erratic loading on the bit caused by elasticity and heterogeneity of the ice-and-gravel matrix, these deposits are extremely difficult to excavate. The approach taken in this research project was to mine only the ore-bearing portion of the deposit using a high-pressure water jet to thaw the gravels and a downhole hydraulic-lift-type pump to bring the ore to he surface as slurry. Full-scale jetting tests in frozen gravel were completed, and the data were used to design a jet excavator. The excavator will deliver a water flow of 890 L/min through a 15.7 mm diam nozzle at 6,900 kPa. The prototype slurry pump was designed to lift minus 15 cm gravels to the surface from a depth of 15 m.
Contact Us:
- Office of Mine Safety and Health (OMSHR)
- National Institute for Occupational Safety and Health (NIOSH)
- Centers for Disease Control and Prevention
- 800-CDC-INFO
(800-232-4636)
TTY: (888) 232-6348 - New Hours of Operation
8am-8pm ET/Monday-Friday
Closed Holidays - omshr@cdc.gov




